{"id":210,"date":"2022-10-22T18:31:57","date_gmt":"2022-10-22T18:31:57","guid":{"rendered":"https:\/\/pcapower.com\/?page_id=210"},"modified":"2022-11-03T17:45:14","modified_gmt":"2022-11-03T17:45:14","slug":"subsidiaries","status":"publish","type":"page","link":"https:\/\/pcapower.com\/?page_id=210","title":{"rendered":"Subsidiaries"},"content":{"rendered":"\n<h1>\n\t\tSUBSIDIARIES\n\t<\/h1>\n<h2>\n\t\tSoutheast Power Corporation\n\t<\/h2>\n\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/pcapower.com\/wp-content\/uploads\/2022\/10\/sepco3.png\" alt=\"\" width=\"134\" height=\"110\" \/>Southeast Power Corporation<br \/>\n1805 Hammock Road<br \/>\nTitusville, FL 32796<br \/>\n321.268.0540 Tel<br \/>\n<a href=\"mailto:info@southeastpower.com\" target=\"_blank\" rel=\"noopener\">info@southeastpower.com<\/a><br \/>\n<a href=\"http:\/\/www.southeastpower.com\/\" target=\"_blank\" rel=\"noopener\">southeastpower.com<\/a>\n\t<p>Southeast Power Corporation and its predecessor company have been serving the electrical industry since 1959. Southeast Power is engaged in the construction and maintenance of power lines, substations, and the installation of fiber optic systems in the Southeast, and mid-Atlantic regions of the United States and Texas.<\/p>\n<h2>\n\t\tC and C Power Line, Inc.\n\t<\/h2>\n\t<a href=\"http:\/\/ccpowerline.com\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/pcapower.com\/wp-content\/uploads\/2022\/10\/c-and-c-black-300x175.png\" alt=\"\" width=\"165\" height=\"96\" \/><\/a>C and C Power Line, Inc<br \/>\n12035 Palm Lake Drive<br \/>\nJacksonville, FL 32218<br \/>\n904.751.6020 Tel<br \/>\n<a href=\"mailto:info@ccpowerline.com\" target=\"_blank\" rel=\"noopener\">info@ccpowerline.com<\/a><br \/>\n<a href=\"http:\/\/www.ccpowerline.com\/\" target=\"_blank\" rel=\"noopener\">ccpowerline.com<\/a>\n\t<p>C and C Power Line, Inc. was established in 1989 as a utility electrical contractor which has grown into a full service electrical and general contractor, servicing investor-owned utilities, municipal utilities, government agencies and privately owned companies. C and C Power Line, Inc. is a member of NECA, IBEW and SELCAT:NECA.<\/p>\n<h2>\n\t\tPrecision Foundations, Inc.\n\t<\/h2>\n\t<a href=\"http:\/\/precisionfoundationsinc.com\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/pcapower.com\/wp-content\/uploads\/2022\/10\/pre-logo3-300x109.png\" alt=\"\" width=\"115\" height=\"42\" \/><\/a>Precision Foundations, Inc.<br \/>\n1688 W. Hibiscus Blvd.<br \/>\nMelbourne, FL 32901<br \/>\n321.360.5274 Tel<br \/>\n<a href=\"mailto:info@precisionfoundationsinc.com\">info@precisionfoundationsinc.com<\/a><br \/>\n<a href=\"http:\/\/www.precisionfoundationsinc.com\/\" target=\"_blank\" rel=\"noopener\">precisionfoundationsinc.com<\/a>\n\t<p>Precision Foundations, Inc., is a full-service foundation drilling contractor that has unparalleled experience in drilled shaft foundations for transmission line and substation structures as well as directly embedded concrete and rock backfill structures.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>SUBSIDIARIES Southeast Power Corporation Southeast Power Corporation 1805 Hammock Road Titusville, FL 32796 321.268.0540 Tel info@southeastpower.com southeastpower.com Southeast Power Corporation and its predecessor company have been serving the electrical industry since 1959. Southeast Power is engaged in the construction and maintenance of power lines, substations, and the installation of fiber optic systems in the Southeast,&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-210","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/pcapower.com\/index.php?rest_route=\/wp\/v2\/pages\/210","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pcapower.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/pcapower.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/pcapower.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pcapower.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=210"}],"version-history":[{"count":6,"href":"https:\/\/pcapower.com\/index.php?rest_route=\/wp\/v2\/pages\/210\/revisions"}],"predecessor-version":[{"id":260,"href":"https:\/\/pcapower.com\/index.php?rest_route=\/wp\/v2\/pages\/210\/revisions\/260"}],"wp:attachment":[{"href":"https:\/\/pcapower.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}